News,

Mladá Boleslav: New cycle path connects Bezděčín and Chrást

Publikováno: 16. listopadu. 2024, 2 min. čtení
Aktualizováno: 03. listopadu. 2024
Úvodní foto: Mladá Boleslav
Publikováno: 16. listopadu. 2024, 2 min. čtení
Aktualizováno: 03. listopadu. 2024
Úvodní foto: Mladá Boleslav

Construction work on a new pedestrian and cyclist path connecting the suburban areas of Bezděčín and Chrást in Mladá Boleslav is nearing completion. The new 1,056-meter-long path runs parallel to the road linking Bezděčín to the roundabout at Chrást.

As part of the project, newly renovated bus stops are being built at the roundabout near Chrást. The road is also undergoing a full-surface repair, which began on October 5 and will continue until mid-November. Throughout this period, the road from Bezděčín to Chrást remains closed to car traffic.

The construction of the over one-kilometer-long path is part of the project “Cycle path in the direction of Bezděčín – Chrást near Mladá Boleslav, including cycle path connections,” which started in full swing in the summer. The project also includes a connection to existing cycle paths, with a connecting section measuring 143 meters. The total investment is 17 million CZK, of which 12 million was funded by the European Union (IROP).

This is an adjusted machine translation using Automat’s CycleLingo Translator (ChatGPT) of this article: https://mestemnakole.cz/2024/10/mlada-boleslav-nova-cyklostezka-propojila-bezdecin-a-chrast/

Přidej komentář

komentář

Pravidla diskuze, Ochrana osobních údajů

Líbil se Vám článek? Podpořte náš další obsah!
Stačí 100 Kč a minuta Vašeho času.

Vyberte prosím částku, poté budete přesmerováni na darujme.cz

Mohlo by vás zajímat : english