In September 2023, the section of cycle route A43 between the cadastral areas of Třeboradice and Veleně was completed. The entire section between Kostelecká Street and the border of the capital city of Prague is now in operation. In the citywide route system, this path is designated as Route A43 in the direction of Kostelec nad Labem, where there is a bridge over the Labe (Elbe) river.
In addition to the gravel path, trees were planted according to the width of the land and furniture was installed. The bridge over the tributary of Třeboradický Creek was repaired. Currently, two-thirds of the path are completed, but the entire route is already accessible and passable for mountain biking.
If it is possible to legalize cycling on the sidewalk along Kostelecká Street, the continuous section will continue with dedicated lanes on Tupolevova Street and a pedestrian and cycling path all the way to Letňanská Street, where Danish lanes are being prepared. Negotiations have been initiated with the Central Bohemian Region regarding the renewal of the connecting path towards Sluhy. Cyclists would thus avoid heavily trafficked roads at the Prague and Central Bohemian Region border when using a fast and direct connections towards the bridge over the Labe in Kostelec nad Labem and popular recreational areas in Ovčáry and beyond.
This is an adjusted ChatGPT translation of this article: https://mestemnakole.cz/2023/09/praha-cakovice-byla-dokoncena-cesta-z-treboradic-do-velene/
Líbil se Vám článek? Chcete v Česku lepší podmínky pro cyklodopravu?
Podpořte nás, stačí i 100 korun. 💙🚲
Vyberte prosím částku, poté budete přesmerováni na darujme.cz